API RP 5B1 PDF

API. RP 5A3. Recommended Practice on Thread Compounds for Casing, Tubing and Line Pipe. RP 5B1. Gauging and Inspection of Casing, Tubing, and Line. Api Rp 5b1 – Gauging And Inspection Of Casing, Tubing, And Line Pipe Threads – 5Th Ed, pdf – Download as PDF File .pdf), Text File .txt) or read online. API RP 5B1: Gauging and inspection of casing, tubing and line pipe 5B: Specification for Threading, Gauging and. Thread Inspection of Casing.

Author: Kazim Meztitilar
Country: Luxembourg
Language: English (Spanish)
Genre: Relationship
Published (Last): 16 September 2014
Pages: 393
PDF File Size: 20.32 Mb
ePub File Size: 15.61 Mb
ISBN: 221-4-21808-759-2
Downloads: 15340
Price: Free* [*Free Regsitration Required]
Uploader: Kazrazshura

Basic definitions provided in the “National Electric Code” have been followed in developing this document, which applies to the classification of locations for both temporarily and permanently installed electrical equipment.

Apave Nigeria :: mission of confidence

Spec 12B, Bolted Tanks for Storage of Production Liquids, 14th Edition, February Covers material, design, and erection requirements for vertical, cylindrical, aboveground, bolted steel tanks in nominal capacities of to 10, barrels in standard sizes for production service. StdWelded Steel Tanks for Oil Ai, 10th Edition, October Covers material, design, fabrication, erection, and testing requirements for aboveground, vertical, cylindrical, closed- and open-top, welded steel storage tanks in various sizes and capacities.

Spec 10A, Well Cements, 22nd Edition, January Covers requirements for manufacturing eight classes of well cements; includes chemical and physical requirements; and physical testing procedures. Applies to tanks with internal pressures approximating atmospheric pressure, but higher pressure is permitted when additional requirements are met.

  14MZ MANUAL PDF

Purchase includes yearly addenda to the current edition of the standard. This standard applies only to tanks whose entire bottoms are uniformly supported and in nonrefrigerated service with a maximum operating temperature of 90 degrees C degrees F. Customary Units6th Edition, November Covers seamless and welded casing and tubing, couplings, pup joints, and connectors in all grades in U.

API – Standards

Includes a new section apo flare gas recovery. RP is intended to be applied where there may be a risk of ignition due to the presence of flammable gas or vapor, mixed with air under normal atmospheric conditions.

Process of manufacture; chemical and mechanical property requirements; methods of testing; and dimensions are included. The tests outlined in this publication are used to evaluate the critical performance properties of thread compounds under laboratory conditions. Provides a general description of the two methods currently used to provide cathodic protection against corrosion.

Suggested solutions to the immediate design and economic and safety problems involved in pressure-relieving discharge systems are presented. It also includes appurtenance requirements.

Specific equipment covered by this specification includes end and outlet connectors; ring gaskets; chokes; valves including surface and underwater safety valves; actuators; and wellhead and Christmas tree equipment examples: Spec ap, Shop Welded Tanks for Storage of Production Liquids, 11th Edition, November Covers material, design, and construction requirements for vertical, cylindrical, aboveground, shop-welded steel tanks in nominal capacities of 90 to bbl in standard sizes for production service.

  FERRAR FENTON BIBLE PDF

Also covers gauge specifications and certification for casing, tubing, and line pipe gauges. Also covers repair and remanufacture of wellhead and Christmas r; equipment that was originally manufactured in accordance with the fifteenth or later edition of this specification.

For reference inside the Library only. RP 12R1, Setting, Maintenance, Inspection, Operation, and Repair of Tanks in Production Service, 5th Edition, August A guide for new tank battery installations and a guide for revamping existing batteries if this apii necessary for any reason.

Individual well flare stacks and systems shall be: Guidelines are provided for examining principal causes of overpressure; determining individual relieving rates; and selecting and designing disposal systems, including such component parts as vessels, flares, and vent stacks. Spec 12P, Fiberglass Reinforced Plastic Tanks, 2nd Edition, January Covers minimum requirements for material, design, fabrication, and testing of fiberglass reinforced plastic tanks.

Spec 12D, Field Welded Tanks for Storage of Production Liquids, 10th Edition, November Covers material, design, fabrication, and erection requirements for vertical, cylindrical, aboveground, welded steel tanks in nominal capacities of to 10, bbl in standard sizes for production service.